September 30th, 2026020From today through Oct 23, the Ziepniekkalns overpass (Ūpju–Kalētu) is closed for Jāņa Čakstes gatve works — Southern Bridge stage 4 grinding toward 2027.
September 28th, 2026038Riga eyes a €20M temporary bridge beside Vanšu during the 2027–29 rebuild — then City Hall deputies call the one-year plan a utopia.
February 18th, 202051393
Rail Baltica infrastructure has been presented recently — including the looks of the Riga Central Station.
The complex construction of the Riga railway bridge, the embankment and the Riga Central Passenger Station will be carried out based on the chosen design solution. This is a sketch of the project for the station and the...